2 Ton Natural Gas Steam Boiler Set to Ship to the Philippines
A beverage processing plant in the Philippines has ordered a 2 ton natural gas steam boiler from TGBOILER. This boiler has a steam output of 2 metric tons per hour and an operating pressure of 1.25 MP
10 Sep .2026
3 ton Horizontal Chain-Grate Boiler Successfully Completed, Set to Ship to Chile
Recently, a Chilean paper mill and TGBOILER reached an agreement for a 3 ton horizontal chain-grate biomass steam boiler. The boiler has been successfully completed and, after undergoing rigorous insp
03 Sep .2026
300kw Oil Burner Is About to Be Exported to Qatar
The customer is a textile mill in Qatar. The burner in the customer’s existing boiler had broken down, so they contacted us to purchase a 300-kW oil burner. The burner is about to be shipped to
27 Aug .2026
2 ton Coal-Fired Steam Boiler Being Shipped to India
TGBOILER has successfully completed the production of a 2 ton horizontal coal-fired boiler. After undergoing rigorous inspections and testing, the boiler is currently being shipped to India, where it
20 Aug .2026
2 Ton Biomass Steam Boiler Successfully Completed, Set to Ship to Cambodia
A 2 t/h horizontal biomass steam boiler (model DZH2-1.25-SCI) purchased by a rice mill in Cambodia has completed production and testing and is set to be shipped to Cambodia. The unit offers high fuel
13 Aug .2026
DZH Series 2-Metric-Ton Biomass Steam Boiler Shipped to Cambodia
Today, TGBOILER successfully completed the manufacturing and testing of a 2 ton biomass steam boiler, which is currently being shipped to Cambodia for use at a local food processing plant.  
06 Aug .2026
Completed & Shipped: 300kg/h Gas Steam Generator for Uzbekistan Dairy Project
Recently, TGBOILER successfully completed the production of a 300 kg/h vertical natural gas steam generator. The unit has undergone rigorous testing and is about to be shipped to Uzbekistan to provide
30 Jul .2026
200 kg/h Vertical Oil-Fired Steam Generator Successfully Completed
Recently, TGBOILER completed the production and testing of a vertical oil-fired steam boiler—purchased by a German customer with a steam output of 200 kg/h and a pressure of 0.7 MPa—within
23 Jul .2026